81319388 - Elaboration of 4 Integrated Catchment Management and Development Plans for the Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare Catchment Management Areas in Lesotho
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · Eschborn, Hessen
Aktenzeichen 81319388veröffentlicht 25.11.2025DienstleistungenOffenes Verfahren
- Geschätzter Wert
- 391 Tsd. €
- Laufzeit
- 7 Monate
- 25.11.2025 – 30.06.2026
- Verfahren
- Offenes Verfahren
Dieses Verfahren ist abgeschlossen oder älter. Die Seite bleibt zur Information erreichbar.
Diese Frist ist vorbei. Das läuft gerade
Offene Ausschreibungen derselben Leistung im Gebiet Main-Taunus-Kreis.
- 10032182-Building the capacities of smallholder farmers on agriculture best practices, and climate smart agriculture in Upper EgyptDeutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · EschbornFrist 10.12.2026
- Kommunale Gebäude- und InventarversicherungMain-Taunus-Kreis - Der Kreisausschuss · Hofheim am TaunusFrist 11.11.2026
- 10041825 - Supporting GIZ in the development of Green Climate Fund Concept Notes and Funding Proposals for up to three projectsDeutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · EschbornFrist 01.12.2026
- 10032371 - Strengthening reproductive health and empowerment of young womenDeutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · EschbornFrist 23.11.2026
Alle Ausschreibungen: Dienstleistungen in Hessen (154 offen)
Geplant · Neuausschreibung möglich
Vertrag endete voraussichtlich am
bereits erreicht · Ende steht in der Bekanntmachung · Verlängerung möglich (bis zu 2-mal)
Endet ein Vertrag, schreibt die Vergabestelle die Leistung oft neu aus. Merken Sie den Vertrag vor: Wir erinnern Sie per E-Mail vor dem Vertragsende und melden, wenn dieselbe Vergabestelle eine ähnliche Leistung ausschreibt.
Verlängerungen sind nicht eingerechnet. Ob und wann neu ausgeschrieben wird, entscheidet die Vergabestelle. Die Erkennung einer Neuausschreibung ist eine Schätzung. Weitere auslaufende Verträge
Auf einen Blick
- Art des Auftrags
- Dienstleistungen
- Geschätzter Wert
- 391 Tsd. €
- Laufzeit
- 7 Monate25.11.2025 – 30.06.2026, bis zu 2 Verlängerungen
- Lose
- 1
- Verfahren
- Offenes VerfahrenVgV, EU-weit
- Rahmenvereinbarung
- nein
- Ort der Leistung
- Eschborn65760, Main-Taunus-Kreis, Hessen
- Einreichung
- ?keine Angabe
Schnellprüfung für Bieter
- ?Unterlagen frei zugänglichkeine Angabe
- ?Elektronische Einreichung verpflichtendkeine Angabe
- ?Nebenangebote zugelassenkeine Angabe
- ?Mehrere Hauptangebote zugelassenkeine Angabe
- ?Laut Auftraggeber für KMU geeignetkeine Angabe
- ?Sicherheiten verlangtkeine Angabe
- ?Teilnahme vorbehalten (z. B. Werkstätten)keine Angabe
- ?E-Rechnung verpflichtendkeine Angabe
- ?Vertraulichkeitserklärung verlangtkeine Angabe
- Elektronische Auktionnein
- Aus EU-Mitteln finanziertja
- ?Wiederkehrender Auftragkeine Angabe
Einordnungvon uns ausgewertet
Alle interessierten Unternehmen dürfen ein Angebot abgeben.
Es wird nicht verhandelt. Gewertet wird das Angebot so, wie es eingereicht wurde.
Kein Angebot mehr möglich. Wer gewonnen hat und wie viele Angebote eingingen, steht unter Zuschläge; für Folgeaufträge lohnt der Blick auf Laufzeit und Vergabestelle.
Das Verfahren ist abgeschlossen; diese Meldung nennt das Ergebnis.
Bei dieser Vergabestelle vergehen von der ersten Meldung bis zum Ergebnis im Mittel 122 Tage (268 Verfahren, 24 Monate).
Sie erhält im Median 3 Angebote je Los (994 Lose mit Angabe).
Die Gewichtung von Preis und Leistung steht nicht in der Bekanntmachung, nur in den Vergabeunterlagen.
Unterlagen schon heruntergeladen? Vergabeunterlagen prüfen (Team): Fristen, Gewichtung, Mengen, Zertifikate und Fehler im Preisblatt.
Fristen und TermineStand 07.11.2026
- Veröffentlichungvor 11 Monaten
- Vertragsbeginnvor 11 MonatenLaufzeit bis 30.06.2026
- Heute
Beschreibung
The Government of Lesotho, with support from the EU and the BMZ, has embarked on an ambitious "National Programme for ICM (ReNoka)" ("re noka" in Sesotho means "we are a river"). Its aim is to rehabilitate degraded watersheds across the country and to put in place prevention measures that will halt the further degradation of Lesotho"s catchment areas. The sustainable management of Lesotho"s catchments are of critical importance for water, land, energy and food security not only in Lesotho itself but in the entire Orange-Senqu Basin and Gauteng Province, one of Southern Africa"s economic centres. The GIZ has been commissioned by the EU and the BMZ as part of its transboundary water management (TWM) programme for Southern African Development Community (SADC) to implement a technical cooperation project (Action) to support ICM / ReNoka in Lesotho. The overall objective of the Action is that "ICM facilitates socio-economic development and adaptation to climate change in Lesotho", while the specific objective is "ICM is institutionalised and under full implementation in Lesotho, based on gender equality and climate adaptation principles". To achieve this objective, the Action work concurrently on five interlinked outputs: - Output 1: Effective and efficient, gender sensitive and climate-resilient policy framework for ICM is developed and applied. - Output 2: Effective and efficient institutions for ICM are established, with equitable representation of women and youth. - Output 3: Capacity, skills and knowledge of public, private sector and civil society for sustainable ICM is facilitated. - Output 4: ICM measures are implemented. - Output 5: Capacity strengthened for coordination, monitoring, supervision and general programme management.
Lesotho is sub-divided into six Catchment Management Areas of (CMAs) to facilitate the planning and management of its three river basins (Senqu river basin, Mohokare river basin and Makhaleng river basin). The six CMAs are Upper Senqu, Lower Senqu, Upper Mohokare, Central Mohokare, Lower Mohokare and Makhaleng. Lesotho"s Long-term Water and Sanitation Strategy (2014) calls for the preparation of Integrated Catchment Management and Development Plans (ICMDPs) in consultation with stakeholders and guidelines for their elaboration as key components to support Integrated Catchment Management in Lesotho. So far two of the six ICMDPs have been elaborated, these are two ICMDPs for Upper Mohokare and Makhaleng CMAs. The objective of this assignment is therefore to elaborate four ICMDPs for the following CMAs: Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare.
Beschreibung des Loses
The objective of the assignment is to elaborate 4 Integrated Catchment Management and Development Plans (ICMDPs) for the 4 Catchment Management Areas (CMAs) of Lesotho namely: Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare. The elaboration of these four (4) ICMDPs in Lesotho will contribute to the programme objectives of "Action", "Support to Integrated Catchment Management in Lesotho (ICM)" which is part of the Transboundary Water Management in the SADC (TWM). Relevant specific objective of the action is "to ensure ICM is institutionalized and under full implementation in Lesotho, based on gender equality and climate adaptation principles and relevant indicator being "Number of climate resilient and gender sensitive Integrated Catchment Management and Development Plans (ICMDPs) at Catchment Management Area level based on national guidelines developed and approved by respective structures." This objective aligns with overall TWM module objectives: The contractor is responsible for providing the following work packages and for achieving the corresponding deliverables below. WP 1: Project planning and stakeholder engagement Tasks 1.1: Thoroughly familiarizes with the ICM landscape in Lesotho, the goals of the national ICM program (ReNOKA) and carry out the kick-off meeting, 1.2: Development of methodology for stakeholder consultation and the desktop review. 1.3: Planning of activities and preparation of inception report Deliverable WP 1: Inception report with detailed activity plan WP 2: Situation analysis and diagnostic (problem) analysis Tasks 2.1: Carry out a desktop data review according to the guidelines of annexes 2. 2.2: Conduct stakeholder consultations to collect additional relevant information and data about the 4 CMAs. 2.3: Elaboration of the situational analysis for the 4 CMAs according to annexes 1&2. 2.4: Elaboration of the diagnostic (problem) analysis for the 4 CMAs according to annexes 1&2 The consultant shall develop the situational analysis for the 4 CMAs according to the attached annexes 1&2 and perform a diagnostic (problem) analysis based on the findings of the situational analysis in the following sequence: - Identification of the main ICM related problems for each CMA. - Elaboration of cause - impact chains for each of the identified problems. - Development of criteria to establish a ranking of Sub-Catchments where identified problems are most prominent (PSC listing). Deliverable WP 2: Draft situation analysis and diagnostic analysis for the 4 CMAs
WP 3: Strategic Action Plan (SAP) and finalization of four (4) ICMDPs) Tasks 3.1: Presentation of situational and diagnostic (problem) analysis and development of the SAP for the 4 ICMDPs during workshops. 3.2: Finalization of four (4) ICMDPs. The SAP must: - Define the vision and strategic objectives for CMAs and define its strategic actions and interventions based on the diagnostic (problem) analysis and its causes - impact chains. - Ensure that all strategic activities include climate change adaptation components. - Design a medium term (5-year) strategic framework to guide the development of integrated sub-catchment management plans (ISCMPs) and local council action plans. - Consider upstream and downstream linkages with other catchments. - Identify multi-year integrated water resource management (IWRM) and development interventions. - Elaborate on financing options and suggest a management and reporting structure for the implementation of SAP according to existing legal framework of Lesotho.
Deliverable WP 3: Strategic Action Plans for the 4 CMAs The delivery of the assignment is planned for a duration of 7 months after award of the contract. The contractor will be responsible for steering the consultants, reporting, cost management, supplies and equipment, ensuring backstopping and data protection.
Bedingungen
Zuschlag3 von 3 angegeben
- Preis
- PriceGewichtung (Punkte, genau) 30Consideration of the price through the valuation method "Bestangebots-Quotienten-Methode"
- Qualität
- Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.)Gewichtung (Punkte, genau) 70Zur Ermittlung des wirtschaftlichsten Bieters wird hier von der Vergabestelle die erreichte Gesamtpunktzahl nach fachlicher Wertung eingetragen. Es werden nur Angebote mit einer fachlichen Bewertung von mindestens 500 Punkten gewertet. Fachliche Angebote mit weniger Punkten scheiden als fachlich ungeeignet aus.
- Qualität
- Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.)Zur Ermittlung des wirtschaftlichsten Bieters wird hier von der Vergabestelle die erreichte Gesamtpunktzahl nach fachlicher Wertung eingetragen. Es werden nur Angebote mit einer fachlichen Bewertung von mindestens 500 Punkten gewertet. Fachliche Angebote mit weniger Punkten scheiden als fachlich ungeeignet aus.
Eignung0 von 2 angegeben
- Kriterien
- ?keine Angabe
- Nachreichen von Unterlagen
- ?keine Angabe
Laufzeit und Umfang5 von 5 angegeben
- Vertragsbeginn
- 25.11.2025
- Vertragsende
- 30.06.2026
- Verlängerung
- bis zu 2-mal: GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
- Optionen
- GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
- Rahmenvereinbarung
- nein
Angebot und Einreichung0 von 8 angegeben
- Elektronische Einreichung
- ?keine Angabe
- Einreichung über
- ?keine Angabe
- Sprache
- ?keine Angabe
- Nebenangebote
- ?keine Angabe
- Mehrere Hauptangebote
- ?keine Angabe
- Bindefrist
- ?keine Angabe
- Angebotsöffnung
- ?keine Angabe
- Sicherheiten
- ?keine Angabe
Ausführung2 von 5 angegeben
- Vertraulichkeit
- ?keine Angabe
- E-Rechnung
- ?keine Angabe
- Vorbehaltene Ausführung
- ?keine Angabe
- Strategische Beschaffung
- Verringerung der Auswirkungen auf die Umwelt, Erfüllung sozialer Zielsetzungen
- EU-Mittel
- Auftragsvergabeprojekt ganz oder teilweise aus EU-Mitteln finanziert
Rechtsschutz3 von 3 angegeben
- Nachprüfungsstelle
- Vergabekammern des Bundes, Kaiser-Friedrich-Straße 16, 53113 Bonn
- Fristen für Nachprüfungsanträge
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as 1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a co … ganz lesenkürzer
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as 1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected, 2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice. 3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids, 4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint. Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.- Beschaffungsübereinkommen (GPA)
- fällt darunter
Zusätzliche Informationen1 von 1 angegeben
- Hinweis
- #Bekanntmachungs-ID: CXTRYY6YTZWJ8XVQ# All communication takes place in English via communication tool in the project area of the procurement portal.
Keine Angabe passt zu diesem Suchbegriff.
Bezeichnungen aus den amtlichen eForms-Codelisten (EU und eForms-DE). Maßgeblich sind die Vergabeunterlagen.
Zuschläge
| Zuschlag an | Angebote |
|---|---|
| NIRAS Germany GmbH, Stuttgart | 8 |
AuftraggeberZur Seite der Vergabestelle
- Anschrift
- Dag-Hammarskjöld-Weg 1 - 5, 65760 Eschborn
- Website
- giz.de
- Kontakt
- kein Funktionspostfach angegeben, siehe Originalbekanntmachung
Bei uns erfasst
- Electrical Equipment and Cables06.11.2026
- 10047547-CONFIDENTIAL PROGRAMME OF MEASURES (PoMs) FOR BARAK RIVER BASIN MANAGEMENT PLAN USING RBM CYCLE APPROACH05.11.2026
- 100586746-UNDP-Fachkonferenz - 02.-04.12.2026 in Bonn05.11.2026
- 10044905 - Kommunikationsberatung für das Globalvorhaben Verantwortungsvolle Land Governance05.11.2026
Mehr von Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- 10060870-Étude d"opportunité et de faisabilité de la plateforme SNIFDeutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · RabatFrist 26.11.2026
- PV-plant for ChadDeutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · EschbornFrist 12.11.2026
- 10062071 - WärmepumpenDeutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · EschbornFrist 19.11.2026
- 10017688 - National Information Sharing and Analysis FrameworkDeutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · EschbornFrist 04.12.2026
Alle 68 offenen Ausschreibungen von Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, dazu Zuschläge und Auftragnehmer
Marktumfeldvon uns ausgewertet
Vergabemeldungen der letzten 24 Monate mit Hauptgegenstand CPV 907 (Dienstleistungen im Umweltschutz) in Hessen. Abgeleitet aus veröffentlichten Bekanntmachungen, keine amtliche Statistik. Zuschlagswerte unter 1.000 € zählen wir als Platzhalter nicht mit.
Mehr Marktdaten, Vergabestellen und offene Ausschreibungen: Dienstleistungen in Hessen (154 offen)
Häufige Zuschlagsempfänger
- GFA Consulting Group GmbH4 Zuschläge
- IP Consult, Institut für Projektplanung GmbH4 Zuschläge
- Froelich & Sporbeck GmbH & Co. KG3 Zuschläge
- triplan Umwelttechnik3 Zuschläge
- AGROLAB Umwelt GmbH2 Zuschläge
- BAUER Resources GmbH2 Zuschläge
Preise und WettbewerbPremium
Verlauf des Verfahrens4 Meldungen
- Vergabebekanntmachung (diese Seite)
- 1. Berichtigung · Aktualisierte InformationenFrist von 30.09.2025 auf 10.10.2025 verschoben
- BekanntmachungFrist 30.09.2025
- 1. Berichtigung · Aktualisierte InformationenFrist 10.10.2025
Berichtigte Fassungen bleiben aufrufbar. Die Suche zeigt je Verfahren nur die aktuelle.
Ähnliche offene Ausschreibungen
- Mission d´accompagnement stratégique, technique et du renforcement des capacités de la délégation tunisienne aux négociations de la Convention-cadre des Nations Unies sur les changements climatiques (CCNUCC) dans le cadre de l'après-COP31, de la COP32Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHFrist 23.11.2026
- 10060562 - GHG Mitigation Technical Advisory and Assessment ServicesDeutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHFrist 30.11.2026
- 10012255-Short Term Expert Support on Sustainable and Inclusive Mobility in ColombiaDeutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHFrist 23.11.2026
- Umweltanalytik WetzlarHessen Mobil, Straßen- und Verkehrsmanagement, ZentraleFrist 09.11.2026
Quelle: Bekanntmachungsservice des Bundes (oeffentlichevergabe.de), Lizenz CC0. Stand der Daten: 03.11.2026. Maßgeblich ist allein die Originalbekanntmachung. Kennung 51c9c9d5-2eac-4db9-bf80-0f32952312fd.